Triple

T25685527
Position Surface form Disambiguated ID Type / Status
Subject National Highways and Infrastructure Development Corporation Limited E644057 entity
Predicate instanceOf P0 FINISHED
Object road development organization C46410 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road development organization
Context triple: [National Highways and Infrastructure Development Corporation Limited, instanceOf, road development organization]
  • A. road construction company chosen
    A road construction company is an organization that plans, designs, builds, repairs, and maintains roads and related infrastructure for public and private clients.
  • B. road infrastructure
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • C. road manager
    A road manager is responsible for planning, coordinating, and overseeing the maintenance, safety, and efficient operation of road networks within a designated area.
  • D. toll road project
    A toll road project is a transportation infrastructure initiative that plans, finances, constructs, and operates a roadway funded primarily through user fees collected from vehicles using the road.
  • E. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e8046888190b07ffa58c7e2c37a completed April 21, 2026, 1:41 p.m.
Created at: April 21, 2026, 8:08 p.m.