Triple

T25672420
Position Surface form Disambiguated ID Type / Status
Subject Metra zone E E643714 entity
Predicate instanceOf P0 FINISHED
Object Metra fare zone C50625 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Metra fare zone
Context triple: [Metra zone E, instanceOf, Metra fare zone]
  • A. Chicago 'L' branch
    A Chicago 'L' branch is a specific route segment of the Chicago elevated rapid transit system that diverges from a main line to serve particular neighborhoods or corridors.
  • B. South Shore Line station
    A South Shore Line station is a designated stop along the South Shore Line commuter rail system where passengers can board, alight, and transfer between trains and other modes of transportation.
  • C. Purple Line station
    A Purple Line station is a designated stop or terminal along a transit system's Purple Line where passengers can board, alight, and transfer between services.
  • D. Chicago 'L' station stop
    A Chicago 'L' station stop is a designated passenger boarding and alighting point along the Chicago Transit Authority’s elevated and subway rail network, typically featuring platforms, signage, fare controls, and connections to other transit services.
  • E. Chicago 'L' service
    Chicago 'L' service is the rapid transit system of Chicago, consisting of elevated, subway, and at-grade rail lines that provide frequent urban and suburban passenger transportation across the metropolitan area.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e7f69808190ad27df1006f6037a completed April 21, 2026, 1:41 p.m.
Created at: April 21, 2026, 7:30 p.m.