Triple

T25671838
Position Surface form Disambiguated ID Type / Status
Subject Montreal Metro Blue Line extension E643698 entity
Predicate instanceOf P0 FINISHED
Object rapid transit line extension project C35368 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rapid transit line extension project
Context triple: [Montreal Metro Blue Line extension, instanceOf, rapid transit line extension project]
  • A. rapid transit expansion project chosen
    A rapid transit expansion project is a coordinated planning, design, and construction effort to extend or enhance high-capacity public transportation networks to improve urban mobility and accommodate future demand.
  • B. commuter rail line extension
    A commuter rail line extension is an added segment of track and associated stations that lengthens an existing suburban passenger rail route to serve new areas and increase connectivity.
  • C. light rail expansion project
    A light rail expansion project is a coordinated planning, design, and construction effort to extend an existing light rail transit system’s routes, capacity, and supporting infrastructure to serve additional areas and riders.
  • D. subway line extension
    A subway line extension is an added segment of track and stations that lengthens an existing subway route to serve new areas and increase transit capacity.
  • E. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e7f69808190ad27df1006f6037a completed April 21, 2026, 1:41 p.m.
Created at: April 21, 2026, 7:29 p.m.