Triple

T25669557
Position Surface form Disambiguated ID Type / Status
Subject Northwestern Turnpike E643627 entity
Predicate instanceOf P0 FINISHED
Object turnpike C3122 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: turnpike
Context triple: [Northwestern Turnpike, instanceOf, turnpike]
  • A. toll road
    A toll road is a roadway for which drivers must pay a fee, typically at designated points or electronically, to use its infrastructure.
  • B. toll highway
    A toll highway is a high-speed road where drivers must pay a fee, typically at toll booths or electronically, to use the roadway for travel.
  • C. toll bridge
    A toll bridge is a bridge where users must pay a fee to cross, typically to fund its construction, maintenance, or operation.
  • D. highway chosen
    A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
  • E. motorway
    A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e7f69808190ad27df1006f6037a completed April 21, 2026, 1:41 p.m.
Created at: April 21, 2026, 7:23 p.m.