Triple

T25664502
Position Surface form Disambiguated ID Type / Status
Subject Corn Ranch E643474 entity
Predicate instanceOf P0 FINISHED
Object rocket test facility C5843 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rocket test facility
Context triple: [Corn Ranch, instanceOf, rocket test facility]
  • A. NASA rocket engine test facility
    A NASA rocket engine test facility is a specialized complex equipped with infrastructure, instrumentation, and safety systems to ground-test and validate rocket engines under controlled, flight-like conditions.
  • B. rocket motor manufacturing facility
    A rocket motor manufacturing facility is a specialized industrial plant where rocket propulsion systems and their components are designed, fabricated, assembled, and tested under strict safety and quality controls.
  • C. space launch facility chosen
    A space launch facility is a specialized complex equipped with infrastructure, systems, and support services for preparing, launching, and sometimes recovering spacecraft and launch vehicles.
  • D. weapons testing facility
    A weapons testing facility is a secure, controlled site where weapons and related systems are developed, evaluated, and tested for performance, safety, and reliability.
  • E. testing facility
    A testing facility is a specialized environment equipped with tools, equipment, and procedures designed to systematically evaluate, measure, and validate the performance, safety, or quality of products, systems, or processes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e7e45648190a068ed3faa8016ea completed April 21, 2026, 1:41 p.m.
Created at: April 21, 2026, 7 p.m.