Triple

T25658161
Position Surface form Disambiguated ID Type / Status
Subject Great British Railways E643296 entity
Predicate instanceOf P0 FINISHED
Object proposed national rail authority C5167 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: proposed national rail authority
Context triple: [Great British Railways, instanceOf, proposed national rail authority]
  • A. national railway system
    A national railway system is a coordinated network of rail infrastructure, services, and governance that provides passenger and freight transportation across a country.
  • B. national railway company chosen
    A national railway company is a state-owned or state-controlled organization responsible for operating and managing a country's primary passenger and freight rail transport services and infrastructure.
  • C. railway closure programme
    A railway closure programme is a coordinated policy initiative to systematically evaluate, reduce, or discontinue rail services and infrastructure, typically to cut costs, reallocate resources, or reshape a rail network.
  • D. rail safety regulator
    A rail safety regulator is an authority responsible for setting, monitoring, and enforcing safety standards and practices across railway systems to protect passengers, workers, and the public.
  • E. British Railways policy document
    A British Railways policy document is an official written directive issued by British Railways that defines rules, procedures, and standards governing its operations, staff conduct, and strategic decisions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e7d8a848190a98d0162325fd780 completed April 21, 2026, 1:41 p.m.
Created at: April 21, 2026, 6:37 p.m.