Triple
T25646302
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Haliday Island Wildlife Sanctuary |
E642975
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | riverine island |
C38228
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: riverine island Context triple: [Haliday Island Wildlife Sanctuary, instanceOf, riverine island]
-
A.
riverine sanctuary
A riverine sanctuary is a protected natural area centered around a river and its surrounding ecosystems, preserving aquatic and riparian habitats while supporting biodiversity and sustainable human use.
-
B.
island
An island is a landmass completely surrounded by water, smaller than a continent and isolated from other substantial land areas.
-
C.
riverine landform
chosen
A riverine landform is a natural feature of the Earth's surface shaped or created by the processes of flowing river water, such as channels, floodplains, deltas, and terraces.
-
D.
tidal sandbank islets
Tidal sandbank islets are small, often temporary landforms composed of sand that emerge above the water’s surface at low tide and may be partially or fully submerged at high tide.
-
E.
former island
A former island is a landform that was once completely surrounded by water but has since become connected to a larger landmass or lost its insular status due to natural or human-induced changes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e77e7ce28081908b08d65ee6e5c8be |
completed | April 21, 2026, 1:41 p.m. |
Created at: April 21, 2026, 5:54 p.m.