Triple

T2563168
Position Surface form Disambiguated ID Type / Status
Subject Shakyamuni Buddha E57288 entity
Predicate finalPassing P40510 FINISHED
Object parinirvāṇa LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: parinirvāṇa | Statement: [Shakyamuni Buddha, finalPassing, parinirvāṇa]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: finalPassing
Context triple: [Shakyamuni Buddha, finalPassing, parinirvāṇa]
  • A. finalStep
    Indicates that an action or state represents the last step or concluding stage in a process or sequence.
  • B. passedExam
    Indicates that an entity has successfully met the required criteria to pass a particular exam.
  • C. passes
    Indicates that one entity successfully transfers, hands over, or moves something (such as an object, message, or responsibility) to another entity.
  • D. passed
    Indicates that one entity successfully transferred control, responsibility, or an item (such as an object, message, or test) to another entity or through a specified stage or condition.
  • E. finalScore
    Indicates the resulting or overall score achieved after all contributing actions, events, or evaluations are completed.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4a4ef9008190a0e6d4422b9418b7 completed March 6, 2026, 9:42 p.m.
NER Named-entity recognition batch_69abd35c6ee88190b6eaa1841d3e99a4 completed March 7, 2026, 7:27 a.m.
PD Predicate disambiguation batch_69abd0caeb488190b0dd8e48d0f2777d completed March 7, 2026, 7:16 a.m.
PDg Predicate description generation batch_69abd35b216881908f4ef32d1c1e5080 completed March 7, 2026, 7:27 a.m.
Created at: March 6, 2026, 9:48 p.m.