Triple

T2558789
Position Surface form Disambiguated ID Type / Status
Subject Monroe County, Georgia E57191 entity
Predicate hasMajorHighway P385 FINISHED
Object Interstate 475 E232622 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 475 | Statement: [Monroe County, Georgia, hasMajorHighway, Interstate 475]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 475
Context triple: [Monroe County, Georgia, hasMajorHighway, Interstate 475]
  • A. Interstate 475 chosen
    Interstate 475 is a bypass route of Interstate 75 that diverts through traffic around the city of Macon in central Georgia.
  • B. Interstate 476
    Interstate 476 is a major auxiliary Interstate Highway in eastern Pennsylvania that runs from near Chester through the western suburbs of Philadelphia to the Pocono Mountains, serving as a key north–south transportation corridor.
  • C. Interstate 278
    Interstate 278 is a major auxiliary highway in the New York City metropolitan area that connects several boroughs via key crossings such as the Robert F. Kennedy Bridge.
  • D. Interstate 275
    Interstate 275 is a bypass freeway in southeastern Michigan that forms part of the outer beltway around the Detroit metropolitan area.
  • E. Interstate 275
    Interstate 275 is a major auxiliary Interstate Highway that serves as a bypass and urban loop around the Tampa Bay area in Florida.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4a4ef9008190a0e6d4422b9418b7 completed March 6, 2026, 9:42 p.m.
NER Named-entity recognition batch_69abd333370c8190b1d64ec99e999913 completed March 7, 2026, 7:26 a.m.
NED1 Entity disambiguation (via context triple) batch_69d5e25dcb108190aaed79d8c64361a8 completed April 8, 2026, 5:06 a.m.
Created at: March 6, 2026, 9:48 p.m.