Triple

T25586070
Position Surface form Disambiguated ID Type / Status
Subject Big Cliff Dam E641384 entity
Predicate instanceOf P0 FINISHED
Object re-regulating dam C50487 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: re-regulating dam
Context triple: [Big Cliff Dam, instanceOf, re-regulating dam]
  • A. proposed dam project
    A proposed dam project is a planned infrastructure initiative to construct a barrier across a waterway for purposes such as water storage, flood control, energy generation, or irrigation, pending approval and implementation.
  • B. reservoir dam
    A reservoir dam is a large engineered barrier built across a watercourse to store and regulate water in an upstream reservoir for purposes such as water supply, flood control, irrigation, and power generation.
  • C. dam expansion project
    A dam expansion project is a large-scale infrastructure initiative to increase an existing dam’s capacity, performance, or functionality—typically to enhance water storage, energy generation, or flood control—through structural modifications and associated environmental and social mitigation measures.
  • D. irrigation dam
    An irrigation dam is a barrier constructed across a watercourse to store and regulate water specifically for agricultural use, enabling controlled distribution to fields and crops.
  • E. hydroelectric dam
    A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75dc42b588190a98b58e0df359674 completed April 21, 2026, 11:21 a.m.
Created at: April 21, 2026, 4:16 p.m.