Triple

T25583758
Position Surface form Disambiguated ID Type / Status
Subject Piedmont corridor E641322 entity
Predicate infrastructureImprovements P91743 FINISHED
Object grade crossing upgrades LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: grade crossing upgrades | Statement: [Piedmont corridor, infrastructureImprovements, grade crossing upgrades]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: infrastructureImprovements
Context triple: [Piedmont corridor, infrastructureImprovements, grade crossing upgrades]
  • A. proposedInfrastructure
    Indicates that an infrastructure project or facility has been suggested or planned but not yet approved, built, or implemented between the related entities.
  • B. infrastructureProjects chosen
    Indicates that there are planned, ongoing, or completed construction or development works related to physical or organizational infrastructure involving the associated entities.
  • C. hasRoadImprovementProject
    Indicates that there is a planned, ongoing, or completed project aimed at improving or upgrading a road or roadway infrastructure between the related entities.
  • D. infrastructureNeed
    Indicates that an entity requires the development, improvement, or provision of infrastructure to meet its functional or operational needs.
  • E. hasRoadImprovements
    Indicates that road-related enhancements, upgrades, or maintenance activities have been carried out or are planned for a given location or roadway segment.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75dc42b588190a98b58e0df359674 completed April 21, 2026, 11:21 a.m.
NER Named-entity recognition batch_69f5f9675ae88190a09942a3a71be3ab completed May 2, 2026, 1:17 p.m.
PD Predicate disambiguation batch_69f4a0f7c6008190ae8cee3e71e19b94 completed May 1, 2026, 12:47 p.m.
Created at: April 21, 2026, 4:14 p.m.