Triple
T25581186
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | MP 59 |
E641244
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rubber-tyred Paris Métro rolling stock |
C11648
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rubber-tyred Paris Métro rolling stock Context triple: [MP 59, instanceOf, rubber-tyred Paris Métro rolling stock]
-
A.
metro train
chosen
A metro train is an electrically powered, multi-car rail vehicle designed to transport large numbers of passengers quickly and frequently along dedicated urban and suburban transit lines.
-
B.
streetcar system
A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
-
C.
New York City Subway rolling stock class
A New York City Subway rolling stock class is a standardized group of subway cars sharing common design, technical specifications, and operational characteristics used on the NYC subway system.
-
D.
predecessor of the Paris Métro
A predecessor of the Paris Métro is any earlier urban rail or transport system in Paris—such as horse-drawn trams, omnibuses, or suburban rail lines—that provided mass transit before the opening of the modern underground metro network.
-
E.
rail vehicle
A rail vehicle is a wheeled conveyance designed to operate on railway tracks for transporting passengers, freight, or performing specialized rail-related tasks.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e75dc42b588190a98b58e0df359674 |
completed | April 21, 2026, 11:21 a.m. |
Created at: April 21, 2026, 4:12 p.m.