Triple

T25580384
Position Surface form Disambiguated ID Type / Status
Subject Peking Plan E641223 entity
Predicate implementedBefore P113783 FINISHED
Object outbreak of World War II in Europe LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: outbreak of World War II in Europe | Statement: [Peking Plan, implementedBefore, outbreak of World War II in Europe]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: implementedBefore
Context triple: [Peking Plan, implementedBefore, outbreak of World War II in Europe]
  • A. implementedAfter
    Indicates that one implementation occurs or is introduced only after another specified implementation has taken place or been completed.
  • B. invokedBefore
    Indicates that one event, action, or process is initiated or executed earlier in time than another specified event, action, or process.
  • C. appliedBefore chosen
    Indicates that one action, process, or condition was applied earlier in time than another.
  • D. introducedBefore
    Indicates that one entity was introduced or presented earlier in time than another entity.
  • E. controlledBefore
    Indicates that one entity had control or authority over another entity during a time period that occurred earlier than a specified reference time or event.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75dc42b588190a98b58e0df359674 completed April 21, 2026, 11:21 a.m.
NER Named-entity recognition batch_69f5f93364308190bcffdb00ee0ec6c7 completed May 2, 2026, 1:16 p.m.
PD Predicate disambiguation batch_69f4a0f7c6008190ae8cee3e71e19b94 completed May 1, 2026, 12:47 p.m.
Created at: April 21, 2026, 4:11 p.m.