Triple

T2555182
Position Surface form Disambiguated ID Type / Status
Subject Microsoft To Do E56714 entity
Predicate synchronization P25707 FINISHED
Object real-time sync across devices LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: real-time sync across devices | Statement: [Microsoft To Do, synchronization, real-time sync across devices]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: synchronization
Context triple: [Microsoft To Do, synchronization, real-time sync across devices]
  • A. synchronizesWith chosen
    Indicates that two or more entities coordinate their states or activities so that they occur in step or remain temporally consistent with each other.
  • B. isSelfSynchronizing
    Indicates that a process, system, or component can automatically align its timing or state with others without requiring external coordination or control.
  • C. suspension
    Indicates the temporary removal or halting of a privilege, activity, or status for an entity, often as a consequence or precaution.
  • D. multitasking
    Indicates performing multiple tasks or activities at the same time or in rapid alternation.
  • E. cannotHoldSimultaneously
    Indicates that two conditions or states are mutually exclusive and cannot both be true or occur at the same time.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4a4bfec081908039988ec4c86e28 completed March 6, 2026, 9:42 p.m.
NER Named-entity recognition batch_69abd5a33234819082ad49fa6594b6be completed March 7, 2026, 7:37 a.m.
PD Predicate disambiguation batch_69abd0c8b6f08190a68645db3e8b779a completed March 7, 2026, 7:16 a.m.
Created at: March 6, 2026, 9:48 p.m.