Triple
T25545082
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Zandmotor |
E640275
|
entity |
| Predicate | coastalManagementStrategy |
P41538
|
FINISHED |
| Object | soft engineering |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: soft engineering | Statement: [Zandmotor, coastalManagementStrategy, soft engineering]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: coastalManagementStrategy Context triple: [Zandmotor, coastalManagementStrategy, soft engineering]
-
A.
hasCoastManagement
Indicates that an entity is responsible for or involved in the management, regulation, or oversight of coastal areas or coastal resources in relation to another entity or region.
-
B.
coastalProtection
chosen
Indicates measures or actions taken to preserve, defend, or stabilize coastal areas against erosion, flooding, or other marine-related impacts.
-
C.
coastalInteraction
Indicates an interaction or relationship occurring between entities and a coastal environment, such as along shorelines or near the sea.
-
D.
hasCoastalProtectionConcern
Indicates that an entity has an issue, risk, or consideration related to protecting coastal areas from environmental or human impacts.
-
E.
shorelineDevelopment
Indicates the extent to which human-made structures or modifications have been built along a shoreline.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e75dbfff7081909b0aa779d48321d2 |
completed | April 21, 2026, 11:21 a.m. |
| NER | Named-entity recognition | batch_69f5f896f04c81908294db99385b464e |
completed | May 2, 2026, 1:13 p.m. |
| PD | Predicate disambiguation | batch_69f480789be08190ab252a6de3797200 |
completed | May 1, 2026, 10:29 a.m. |
Created at: April 21, 2026, 3:28 p.m.