Triple
T25533924
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ring Transformer |
E639994
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | low-voltage transformer |
C5647
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: low-voltage transformer Context triple: [Ring Transformer, instanceOf, low-voltage transformer]
-
A.
Cassette Transformer
A Cassette Transformer is a modular neural network architecture that processes sequential data in discrete, interchangeable segments ("cassettes") to enable flexible, composable, and context-aware transformations.
-
B.
electrical resonant transformer circuit
chosen
An electrical resonant transformer circuit is a tuned system of inductors and capacitors that transfers energy efficiently at a specific resonant frequency, often used to generate high voltages or enable wireless power transfer.
-
C.
high-voltage generator
A high-voltage generator is a device that converts available electrical or mechanical energy into controlled, significantly elevated voltage levels for applications such as testing, research, and specialized industrial processes.
-
D.
vacuum tube
A vacuum tube is an electronic device that controls the flow of electric current in a sealed, evacuated glass or metal enclosure using electrodes such as cathodes and anodes.
-
E.
transistor
A transistor is a semiconductor device used to amplify or switch electronic signals and electrical power by controlling current flow between its terminals.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e75dbf3f9c8190b3f2a75d1b75d127 |
completed | April 21, 2026, 11:21 a.m. |
Created at: April 21, 2026, 3:16 p.m.