Triple
T25502539
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The Humanist |
E639155
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bi-monthly magazine |
C1615
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bi-monthly magazine Context triple: [The Humanist, instanceOf, bi-monthly magazine]
-
A.
magazine
A magazine is a periodically published collection of articles, stories, photographs, and advertisements centered around specific themes or interests, typically distributed in printed or digital format.
-
B.
periodical
chosen
A periodical is a publication issued at regular intervals (such as daily, weekly, monthly, or quarterly) that contains articles, stories, or other content on various topics.
-
C.
magazine supplement
A magazine supplement is an additional section or insert, often focused on a specific theme or topic, that accompanies the main magazine to provide extra content or advertising.
-
D.
magazine cover
A magazine cover is the front page of a magazine designed to attract attention and convey the issue’s main themes through a combination of imagery, typography, and key headlines.
-
E.
alternative weekly newspaper
An alternative weekly newspaper is a free, non-daily publication that focuses on local arts, culture, and investigative or opinionated journalism, often with a countercultural or progressive perspective.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e75dbd09308190b6b5f0afdc12ec6d |
completed | April 21, 2026, 11:21 a.m. |
Created at: April 21, 2026, 2:45 p.m.