Triple

T25497579
Position Surface form Disambiguated ID Type / Status
Subject Inga III Dam E639020 entity
Predicate instanceOf P0 FINISHED
Object hydroelectric dam project C47831 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hydroelectric dam project
Context triple: [Inga III Dam, instanceOf, hydroelectric dam project]
  • A. hydroelectric dam
    A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
  • B. proposed dam project
    A proposed dam project is a planned infrastructure initiative to construct a barrier across a waterway for purposes such as water storage, flood control, energy generation, or irrigation, pending approval and implementation.
  • C. planned hydroelectric power station chosen
    A planned hydroelectric power station is a proposed facility designed to generate electricity by harnessing the potential and kinetic energy of water, currently in the stages of planning, approval, or early development rather than operation.
  • D. hydroelectric power complex
    A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
  • E. dam expansion project
    A dam expansion project is a large-scale infrastructure initiative to increase an existing dam’s capacity, performance, or functionality—typically to enhance water storage, energy generation, or flood control—through structural modifications and associated environmental and social mitigation measures.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75dbbd2a88190b70e1e645de14b9a completed April 21, 2026, 11:21 a.m.
Created at: April 21, 2026, 2:41 p.m.