Triple
T25492117
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sarnath Buddhist pilgrimage circuit |
E638862
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Buddhist pilgrimage route |
C13199
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Buddhist pilgrimage route Context triple: [Sarnath Buddhist pilgrimage circuit, instanceOf, Buddhist pilgrimage route]
-
A.
Buddhist pilgrimage
chosen
A Buddhist pilgrimage is a journey undertaken by devotees to sacred sites associated with the Buddha’s life, teachings, and relics, seeking spiritual merit, reflection, and deepened faith.
-
B.
Hindu pilgrimage circuit
A Hindu pilgrimage circuit is a traditional route linking multiple sacred sites that devotees visit, often in a prescribed sequence, to gain religious merit, spiritual purification, and blessings.
-
C.
Jain pilgrimage center
A Jain pilgrimage center is a sacred site featuring temples, tirthas, or holy places associated with Jain Tirthankaras and revered monks, where devotees gather for worship, rituals, and spiritual practices.
-
D.
Buddhist religious monument
A Buddhist religious monument is a structure or site, such as a stupa, pagoda, or temple, built to enshrine sacred relics, commemorate the Buddha or enlightened beings, and serve as a focal point for devotion, meditation, and ritual practice.
-
E.
Camino de Santiago route
A Camino de Santiago route is a historically rooted pilgrimage path, composed of interconnected waypoints, infrastructure, and cultural landmarks, that guides travelers from various starting points to the shrine of Saint James in Santiago de Compostela.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e75dbbd2a88190b70e1e645de14b9a |
completed | April 21, 2026, 11:21 a.m. |
Created at: April 21, 2026, 2:38 p.m.