Triple

T25492117
Position Surface form Disambiguated ID Type / Status
Subject Sarnath Buddhist pilgrimage circuit E638862 entity
Predicate instanceOf P0 FINISHED
Object Buddhist pilgrimage route C13199 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Buddhist pilgrimage route
Context triple: [Sarnath Buddhist pilgrimage circuit, instanceOf, Buddhist pilgrimage route]
  • A. Buddhist pilgrimage chosen
    A Buddhist pilgrimage is a journey undertaken by devotees to sacred sites associated with the Buddha’s life, teachings, and relics, seeking spiritual merit, reflection, and deepened faith.
  • B. Hindu pilgrimage circuit
    A Hindu pilgrimage circuit is a traditional route linking multiple sacred sites that devotees visit, often in a prescribed sequence, to gain religious merit, spiritual purification, and blessings.
  • C. Jain pilgrimage center
    A Jain pilgrimage center is a sacred site featuring temples, tirthas, or holy places associated with Jain Tirthankaras and revered monks, where devotees gather for worship, rituals, and spiritual practices.
  • D. Buddhist religious monument
    A Buddhist religious monument is a structure or site, such as a stupa, pagoda, or temple, built to enshrine sacred relics, commemorate the Buddha or enlightened beings, and serve as a focal point for devotion, meditation, and ritual practice.
  • E. Camino de Santiago route
    A Camino de Santiago route is a historically rooted pilgrimage path, composed of interconnected waypoints, infrastructure, and cultural landmarks, that guides travelers from various starting points to the shrine of Saint James in Santiago de Compostela.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75dbbd2a88190b70e1e645de14b9a completed April 21, 2026, 11:21 a.m.
Created at: April 21, 2026, 2:38 p.m.