Triple

T25492034
Position Surface form Disambiguated ID Type / Status
Subject Broadcast Engineering Consultants India Limited E638860 entity
Predicate instanceOf P0 FINISHED
Object public sector undertaking C7167 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75dbbd2a88190b70e1e645de14b9a completed April 21, 2026, 11:21 a.m.
Created at: April 21, 2026, 2:38 p.m.