Triple

T25491064
Position Surface form Disambiguated ID Type / Status
Subject Bigg Boss Telugu E638837 entity
Predicate instanceOf P0 FINISHED
Object Telugu-language television show C45806 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Telugu-language television show
Context triple: [Bigg Boss Telugu, instanceOf, Telugu-language television show]
  • A. Indian television program chosen
    An Indian television program is a serialized or episodic audio-visual production created for broadcast or streaming in India, typically reflecting Indian cultures, languages, and entertainment preferences.
  • B. Indian television soap opera
    An Indian television soap opera is a long-running serialized drama series, typically broadcast daily or weekly, that focuses on emotionally charged family, social, and romantic storylines within Indian cultural settings.
  • C. Telugu literary work
    A Telugu literary work is a written creation composed in the Telugu language, encompassing genres such as poetry, prose, drama, and criticism that reflect the culture, history, and aesthetics of Telugu-speaking communities.
  • D. Spanish-language television show
    A Spanish-language television show is a serialized or episodic audiovisual program primarily produced and broadcast in Spanish, encompassing genres such as drama, comedy, news, reality, and variety for Spanish-speaking audiences.
  • E. Telugu dialect
    A Telugu dialect is a regional or social variety of the Telugu language characterized by distinct phonological, lexical, and syntactic features used by a specific speech community.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75dbbd2a88190b70e1e645de14b9a completed April 21, 2026, 11:21 a.m.
Created at: April 21, 2026, 2:38 p.m.