Triple

T2546425
Position Surface form Disambiguated ID Type / Status
Subject Tesla third-generation platform E57911 entity
Predicate usedInFactory P9818 FINISHED
Object Tesla Gigafactory Shanghai E20934 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tesla Gigafactory Shanghai | Statement: [Tesla third-generation platform, usedInFactory, Tesla Gigafactory Shanghai]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tesla Gigafactory Shanghai
Context triple: [Tesla third-generation platform, usedInFactory, Tesla Gigafactory Shanghai]
  • A. Gigafactory Shanghai chosen
    Gigafactory Shanghai is Tesla’s large-scale electric vehicle and battery manufacturing plant located in Shanghai, China, serving as a major production and export hub for the company.
  • B. Tesla Gigafactory network
    The Tesla Gigafactory network is a global system of large-scale manufacturing plants dedicated to producing electric vehicles, batteries, and related components to support Tesla’s clean energy and transportation ecosystem.
  • C. Gigafactory Nevada
    Gigafactory Nevada is Tesla’s massive battery and electric vehicle component manufacturing plant near Reno, designed to scale production and reduce costs for its clean energy products.
  • D. Gigafactory Texas
    Gigafactory Texas is Tesla’s massive manufacturing complex near Austin that produces electric vehicles and related components as a key hub in the company’s U.S. operations.
  • E. Tesla Megapack
    The Tesla Megapack is a large-scale, utility-grade lithium-ion battery system designed to store energy for the electrical grid and support renewable power integration.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: usedInFactory
Context triple: [Tesla third-generation platform, usedInFactory, Tesla Gigafactory Shanghai]
  • A. areUsedIn
    Indicates that certain entities serve as components, tools, or resources within a particular process, context, or application.
  • B. usedInStructure
    Indicates that something (such as a material, component, or element) is employed as part of the composition or construction of a larger structure.
  • C. usedInWork
    Indicates that something (such as a concept, method, material, or component) is employed or applied within a particular work, project, or creation.
  • D. usedInOperation chosen
    Indicates that something (such as a tool, method, or resource) is employed or applied during the execution of a particular operation or procedure.
  • E. usedInType
    Indicates that something serves as a component, element, or example within a particular type or category.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4a5212d88190b989ce129f2ad87f completed March 6, 2026, 9:42 p.m.
NER Named-entity recognition batch_69abd2e5152c8190b31a5e732d0dde44 completed March 7, 2026, 7:25 a.m.
NED1 Entity disambiguation (via context triple) batch_69af5d0a884c81909d7f537a79ccb435 completed March 9, 2026, 11:51 p.m.
PD Predicate disambiguation batch_69abd0c63964819092d5f578195ae8dd completed March 7, 2026, 7:16 a.m.
Created at: March 6, 2026, 9:47 p.m.