Triple

T2546336
Position Surface form Disambiguated ID Type / Status
Subject BFR E57910 entity
Predicate instanceOf P0 FINISHED
Object two-stage-to-orbit vehicle C3271 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: two-stage-to-orbit vehicle
Context triple: [BFR, instanceOf, two-stage-to-orbit vehicle]
  • A. orbital launch vehicle
    An orbital launch vehicle is a rocket-powered system designed to transport payloads from Earth's surface into orbit by achieving sufficient velocity and altitude to remain in continuous free-fall around the planet.
  • B. orbital test vehicle
    An orbital test vehicle is a reusable or expendable spacecraft designed to conduct experimental missions in Earth orbit to validate technologies, systems, or operational concepts for future spaceflight applications.
  • C. expendable launch vehicle
    An expendable launch vehicle is a rocket designed for a single use to deliver payloads such as satellites or spacecraft into space, after which its components are discarded rather than recovered or reused.
  • D. partially reusable launch vehicle chosen
    A partially reusable launch vehicle is a space launch system in which only some components—such as the first stage, boosters, or engines—are recovered and refurbished for multiple flights, while the remaining parts are expended.
  • E. super heavy-lift launch vehicle
    A super heavy-lift launch vehicle is a powerful rocket system designed to carry extremely large payloads—such as crewed spacecraft, space station modules, or deep-space missions—into Earth orbit or beyond in a single launch.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4a5212d88190b989ce129f2ad87f completed March 6, 2026, 9:42 p.m.
Created at: March 6, 2026, 9:47 p.m.