Triple

T2545827
Position Surface form Disambiguated ID Type / Status
Subject Loop transportation system E57898 entity
Predicate involvesConstructionActivity P39476 FINISHED
Object tunnel boring LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: tunnel boring | Statement: [Loop transportation system, involvesConstructionActivity, tunnel boring]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: involvesConstructionActivity
Context triple: [Loop transportation system, involvesConstructionActivity, tunnel boring]
  • A. constructionLabor
    Indicates a relationship where an entity performs or provides labor specifically for construction-related work or projects.
  • B. constructionSite
    Indicates that an entity is a location or area where construction work is actively taking place or is planned to occur.
  • C. hasConstruction
    Indicates that one entity possesses, contains, or is characterized by a particular construction, structure, or built form associated with it.
  • D. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • E. constructionType
    Indicates the specific method or style by which something is built or constructed.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4a5212d88190b989ce129f2ad87f completed March 6, 2026, 9:42 p.m.
NER Named-entity recognition batch_69abd2c285288190b41fc0188879623a completed March 7, 2026, 7:24 a.m.
PD Predicate disambiguation batch_69abd0c63964819092d5f578195ae8dd completed March 7, 2026, 7:16 a.m.
PDg Predicate description generation batch_69abd1c7b6e48190be9a0c31069df797 completed March 7, 2026, 7:20 a.m.
Created at: March 6, 2026, 9:47 p.m.