Triple

T25377894
Position Surface form Disambiguated ID Type / Status
Subject CEWS Observation and Monitoring Centre E633102 entity
Predicate instanceOf P0 FINISHED
Object early warning centre C50083 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: early warning centre
Context triple: [CEWS Observation and Monitoring Centre, instanceOf, early warning centre]
  • A. public warning system
    A public warning system is an organized infrastructure of technologies, protocols, and communication channels designed to rapidly alert and inform the public about imminent or ongoing emergencies and hazards.
  • B. tsunami warning coordination body
    A tsunami warning coordination body is an organization responsible for detecting tsunami threats, issuing timely alerts, and coordinating communication and response efforts among authorities, emergency services, and the public.
  • C. earthquake monitoring center
    An earthquake monitoring center is a facility that continuously collects, analyzes, and disseminates seismic data to detect earthquakes, assess their impact, and support early warning and emergency response efforts.
  • D. WMO-designated centre
    A WMO-designated centre is an institution officially recognized by the World Meteorological Organization to provide specialized meteorological, hydrological, or climate-related services and support to member states and the global community.
  • E. Volcanic Ash Advisory Centre
    A Volcanic Ash Advisory Centre is a specialized meteorological facility responsible for monitoring volcanic eruptions and providing timely warnings and forecasts about volcanic ash clouds to ensure aviation safety.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a90c0dc819092f928b6ea0ecc72 completed April 21, 2026, 11:08 a.m.
Created at: April 21, 2026, 1:38 p.m.