Triple

T25364632
Position Surface form Disambiguated ID Type / Status
Subject Blessed E636065 entity
Predicate precedesStatus P26849 FINISHED
Object Saint LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Saint | Statement: [Blessed, precedesStatus, Saint]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: precedesStatus
Context triple: [Blessed, precedesStatus, Saint]
  • A. predecessorStatus
    Indicates that one entity’s status is determined by, or directly follows from, the status of a preceding entity in a sequence or process.
  • B. predecessorSeeStatus
    Indicates that the status of an entity is determined by, or follows from, the status of its predecessor.
  • C. precedesInStability
    Indicates that one entity is more stable than another, coming earlier in an ordering based on stability.
  • D. precedesDisc
    Indicates that one discourse segment or unit occurs before another in the sequence of discourse.
  • E. earlierStatus chosen
    Indicates that one status or condition occurred or was valid before another status in time.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a9b7cf481909f2dcdfb37d95ca7 completed April 21, 2026, 11:08 a.m.
NER Named-entity recognition batch_69f61f12b0f08190bc4a16907941864c completed May 2, 2026, 3:58 p.m.
PD Predicate disambiguation batch_69f61b37a5648190b10d33ae205ccfee completed May 2, 2026, 3:41 p.m.
Created at: April 21, 2026, 1:36 p.m.