Triple

T25331611
Position Surface form Disambiguated ID Type / Status
Subject Ganga–Hooghly water diversion E635165 entity
Predicate instanceOf P0 FINISHED
Object river engineering scheme C2937 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: river engineering scheme
Context triple: [Ganga–Hooghly water diversion, instanceOf, river engineering scheme]
  • A. river weir
    A river weir is a low dam built across a river to raise the water level, regulate flow, and sometimes measure discharge or divert water.
  • B. engineered waterway
    An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
  • C. levee system
    A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
  • D. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • E. water transfer project chosen
    A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a9908108190a95427a97020632a completed April 21, 2026, 11:08 a.m.
Created at: April 21, 2026, 1:30 p.m.