Triple
T25329878
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Butt Bridge |
E635118
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge over the River Liffey |
C50028
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge over the River Liffey Context triple: [Butt Bridge, instanceOf, bridge over the River Liffey]
-
A.
Seine bridge
A Seine bridge is a structure that spans the River Seine, providing a crossing for pedestrians, vehicles, or trains while often serving as an architectural and cultural landmark within its urban setting.
-
B.
bridge over the River Trent
A bridge over the River Trent is a structural crossing that spans the river to connect its banks, enabling the movement of people, vehicles, or goods across the waterway.
-
C.
bridge over the River Cam
A bridge over the River Cam is a structure that spans the river to connect its banks, enabling pedestrians, cyclists, or vehicles to cross while often serving as a notable architectural and cultural landmark in the surrounding landscape.
-
D.
river in London
A river in London is a natural or man-made watercourse flowing through or within the boundaries of London, influencing the city’s geography, ecology, transport, and urban development.
-
E.
교량
교량은 도로나 철도, 보행로 등이 강, 계곡, 도로 등 장애물을 안전하고 효율적으로 횡단할 수 있도록 상부구조와 하부구조로 이루어진 구조물이다.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e75a9908108190a95427a97020632a |
completed | April 21, 2026, 11:08 a.m. |
Created at: April 21, 2026, 1:30 p.m.