Triple

T25323214
Position Surface form Disambiguated ID Type / Status
Subject State Highway 9 (West Bengal) E634939 entity
Predicate instanceOf P0 FINISHED
Object road in West Bengal C50023 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road in West Bengal
Context triple: [State Highway 9 (West Bengal), instanceOf, road in West Bengal]
  • A. road in Madhya Pradesh
    A road in Madhya Pradesh is a transportation route—ranging from national highways to rural village paths—that connects cities, towns, and villages across the central Indian state, supporting movement of people, goods, and services.
  • B. National Highway in India
    A National Highway in India is a major public roadway designated and maintained by the central government to connect key cities, ports, and regions across the country for efficient long-distance transportation.
  • C. road in Sri Lanka
    A road in Sri Lanka is a public transportation route, ranging from major paved highways to narrow rural lanes, that connects cities, towns, and villages across the island and supports vehicular, pedestrian, and sometimes animal-drawn traffic.
  • D. road in West Virginia
    A road in West Virginia is a transportation route, ranging from winding rural byways to major highways, that traverses the state's mountainous terrain to connect its towns, cities, and natural landmarks.
  • E. road in New Brunswick
    A road in New Brunswick is a designated transportation corridor within the province that facilitates vehicular travel between communities, regions, and key destinations, following provincial standards for construction, maintenance, and signage.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a9908108190a95427a97020632a completed April 21, 2026, 11:08 a.m.
Created at: April 21, 2026, 1:29 p.m.