Triple
T25318471
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Air Defense Artillery Commandant |
E634812
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | U.S. Army position |
C1993
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: U.S. Army position Context triple: [Air Defense Artillery Commandant, instanceOf, U.S. Army position]
-
A.
United States Army position
chosen
A United States Army position is a specific role or job within the Army’s organizational structure, defined by rank, responsibilities, and duties in support of military operations and administration.
-
B.
United States military position
A United States military position is a formally defined role within the U.S. Armed Forces that carries specific duties, authority, rank, and responsibilities in support of national defense and military operations.
-
C.
United States Army directive
A United States Army directive is an official, authoritative order or instruction issued by Army leadership that establishes or changes policy, procedures, responsibilities, or standards for the organization.
-
D.
NATO military position
A NATO military position is a standardized role or appointment within the North Atlantic Treaty Organization’s integrated command or force structure, defining specific responsibilities, rank equivalencies, and functions across member nations’ armed forces.
-
E.
United States Army command
The United States Army command is the organizational structure and authority framework responsible for directing, coordinating, and controlling Army forces and operations to accomplish national defense objectives.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e75a9847c08190bb02990d06d5ffb7 |
completed | April 21, 2026, 11:08 a.m. |
Created at: April 21, 2026, 1:28 p.m.