Triple

T25314903
Position Surface form Disambiguated ID Type / Status
Subject British Rail Class 317 E634708 entity
Predicate instanceOf P0 FINISHED
Object British Rail EMU C50014 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: British Rail EMU
Context triple: [British Rail Class 317, instanceOf, British Rail EMU]
  • A. British Rail second-generation DMU
    A British Rail second-generation DMU is a diesel multiple unit train introduced from the 1980s onward, featuring improved performance, comfort, and safety over first-generation units and designed for regional and suburban passenger services across the UK rail network.
  • B. British Rail Networker unit
    A British Rail Networker unit is a family of electric and diesel multiple-unit passenger trains introduced in the late 1980s and 1990s for suburban and commuter services in southeast England.
  • C. British Rail Mark 3 variant
    A British Rail Mark 3 variant is a specific version of the Mark 3 passenger rail coach, modified or configured for particular operational roles, comfort standards, or railway operators.
  • D. British Rail Mark 2 coach variant
    A British Rail Mark 2 coach variant is a specific design iteration within the Mark 2 family of passenger railway carriages, distinguished by particular structural, interior, and technical features tailored to different service requirements and eras.
  • E. British Rail Mark 3 coach sub-series
    The British Rail Mark 3 coach sub-series comprises the various specialized variants of the Mark 3 passenger coach design, each adapted for different operators, services, and technical requirements within the UK rail network.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a9847c08190bb02990d06d5ffb7 completed April 21, 2026, 11:08 a.m.
Created at: April 21, 2026, 1:27 p.m.