Triple

T25272386
Position Surface form Disambiguated ID Type / Status
Subject Detroit International Bridge Company E633600 entity
Predicate instanceOf P0 FINISHED
Object bridge operating company C31127 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge operating company
Context triple: [Detroit International Bridge Company, instanceOf, bridge operating company]
  • A. bridge construction company
    A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
  • B. bridge operator
    A bridge operator is an entity responsible for managing and controlling the operation, safety, and coordination of a bridge’s movable or functional components to ensure efficient and secure passage for users.
  • C. bridge authority chosen
    A bridge authority is an entity responsible for the planning, construction, operation, maintenance, and regulation of a bridge or network of bridges, including safety, tolling, and compliance with relevant laws and standards.
  • D. bridge structure
    A bridge structure is an engineered construction that spans physical obstacles such as water, valleys, or roads to provide a stable pathway for transportation or movement.
  • E. public transport bridge
    A public transport bridge is a dedicated crossing structure designed primarily for buses, trams, trains, or other mass transit vehicles to traverse obstacles such as rivers, roads, or valleys efficiently and safely.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a92f48881909974ff9c11150a2e completed April 21, 2026, 11:08 a.m.
Created at: April 21, 2026, 1:16 p.m.