Triple
T25272386
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Detroit International Bridge Company |
E633600
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge operating company |
C31127
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge operating company Context triple: [Detroit International Bridge Company, instanceOf, bridge operating company]
-
A.
bridge construction company
A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
-
B.
bridge operator
A bridge operator is an entity responsible for managing and controlling the operation, safety, and coordination of a bridge’s movable or functional components to ensure efficient and secure passage for users.
-
C.
bridge authority
chosen
A bridge authority is an entity responsible for the planning, construction, operation, maintenance, and regulation of a bridge or network of bridges, including safety, tolling, and compliance with relevant laws and standards.
-
D.
bridge structure
A bridge structure is an engineered construction that spans physical obstacles such as water, valleys, or roads to provide a stable pathway for transportation or movement.
-
E.
public transport bridge
A public transport bridge is a dedicated crossing structure designed primarily for buses, trams, trains, or other mass transit vehicles to traverse obstacles such as rivers, roads, or valleys efficiently and safely.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e75a92f48881909974ff9c11150a2e |
completed | April 21, 2026, 11:08 a.m. |
Created at: April 21, 2026, 1:16 p.m.