Triple

T25259411
Position Surface form Disambiguated ID Type / Status
Subject Nuclear Power Corporation of India Limited E633262 entity
Predicate instanceOf P0 FINISHED
Object Public sector undertaking C25332 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Public sector undertaking
Context triple: [Nuclear Power Corporation of India Limited, instanceOf, Public sector undertaking]
  • A. government-owned company
    A government-owned company is a legal entity engaged in commercial activities that is wholly or majority owned and controlled by a national, regional, or local government.
  • B. government-backed organization
    A government-backed organization is an entity that operates with financial support, authorization, or guarantees from a government to carry out specific public, economic, or policy-related functions.
  • C. مؤسسة مالية عامة
    مؤسسة مالية عامة هي جهة مملوكة كليًا أو جزئيًا للدولة تُنشأ لإدارة الموارد المالية العامة وتقديم خدمات أو أدوات تمويلية تدعم السياسات الاقتصادية والاجتماعية للحكومة.
  • D. federally owned corporation
    A federally owned corporation is a government-established legal entity that operates commercial or public service activities on behalf of the federal government while retaining a distinct corporate structure.
  • E. public sector enterprise chosen
    A public sector enterprise is an organization owned and operated by the government to provide goods or services, often with broader social or strategic objectives beyond profit.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a922ad481908f4f1f884583cb42 completed April 21, 2026, 11:08 a.m.
Created at: April 21, 2026, 1:13 p.m.