Triple
T25258409
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Project Pushpak |
E633235
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | field formation of Border Roads Organisation |
C49933
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: field formation of Border Roads Organisation Context triple: [Project Pushpak, instanceOf, field formation of Border Roads Organisation]
-
A.
strategic military route
A strategic military route is a planned path or corridor used to move troops, equipment, and supplies efficiently while maximizing operational advantage and minimizing vulnerability to enemy action.
-
B.
military engineering tradition
A military engineering tradition is the historically developed body of practices, knowledge, values, and institutional norms that guide how a society designs, constructs, and employs engineering solutions for military purposes across time.
-
C.
Indian Army formation
An Indian Army formation is an organized military unit or grouping, such as a corps, division, brigade, or battalion, structured for command, control, and execution of land-based operations within the Indian Army.
-
D.
Indian Armed Forces formation
An Indian Armed Forces formation is an organized military unit or grouping, such as a command, corps, division, brigade, or equivalent structure, established to plan, coordinate, and conduct operations within the Indian Army, Navy, or Air Force.
-
E.
Inca road system personnel
Inca road system personnel were specialized workers, including messengers (chasquis), maintenance crews, and administrators, responsible for operating, preserving, and overseeing the vast imperial network of roads and way stations.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e75a922ad481908f4f1f884583cb42 |
completed | April 21, 2026, 11:08 a.m. |
Created at: April 21, 2026, 1:13 p.m.