Triple
T25258282
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Project Beacon |
E633231
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | road construction unit |
C49932
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: road construction unit Context triple: [Project Beacon, instanceOf, road construction unit]
-
A.
road construction company
A road construction company is an organization that plans, designs, builds, repairs, and maintains roads and related infrastructure for public and private clients.
-
B.
bridge construction company
A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
-
C.
construction site
A construction site is a designated area where buildings, infrastructure, or other structures are actively being built, renovated, or demolished using labor, machinery, and materials.
-
D.
toll road project
A toll road project is a transportation infrastructure initiative that plans, finances, constructs, and operates a roadway funded primarily through user fees collected from vehicles using the road.
-
E.
road manager
A road manager is responsible for planning, coordinating, and overseeing the maintenance, safety, and efficient operation of road networks within a designated area.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e75a922ad481908f4f1f884583cb42 |
completed | April 21, 2026, 11:08 a.m. |
Created at: April 21, 2026, 1:13 p.m.