Triple

T25258282
Position Surface form Disambiguated ID Type / Status
Subject Project Beacon E633231 entity
Predicate instanceOf P0 FINISHED
Object road construction unit C49932 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road construction unit
Context triple: [Project Beacon, instanceOf, road construction unit]
  • A. road construction company
    A road construction company is an organization that plans, designs, builds, repairs, and maintains roads and related infrastructure for public and private clients.
  • B. bridge construction company
    A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
  • C. construction site
    A construction site is a designated area where buildings, infrastructure, or other structures are actively being built, renovated, or demolished using labor, machinery, and materials.
  • D. toll road project
    A toll road project is a transportation infrastructure initiative that plans, finances, constructs, and operates a roadway funded primarily through user fees collected from vehicles using the road.
  • E. road manager
    A road manager is responsible for planning, coordinating, and overseeing the maintenance, safety, and efficient operation of road networks within a designated area.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a922ad481908f4f1f884583cb42 completed April 21, 2026, 11:08 a.m.
Created at: April 21, 2026, 1:13 p.m.