Triple

T25258227
Position Surface form Disambiguated ID Type / Status
Subject Project Arunank E633229 entity
Predicate instanceOf P0 FINISHED
Object Border Roads Organisation formation C49931 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Border Roads Organisation formation
Context triple: [Project Arunank, instanceOf, Border Roads Organisation formation]
  • A. Indian Army formation
    An Indian Army formation is an organized military unit or grouping, such as a corps, division, brigade, or battalion, structured for command, control, and execution of land-based operations within the Indian Army.
  • B. Indian Armed Forces formation
    An Indian Armed Forces formation is an organized military unit or grouping, such as a command, corps, division, brigade, or equivalent structure, established to plan, coordinate, and conduct operations within the Indian Army, Navy, or Air Force.
  • C. former road bypass
    A former road bypass is a roadway that was originally constructed to divert through-traffic around a town or congested area but has since been decommissioned, reclassified, or repurposed so it no longer functions as the primary bypass route.
  • D. former national highway of India
    A former national highway of India is a roadway that was once part of the country's officially designated national highway network but has since been renumbered, reclassified, or decommissioned from that status.
  • E. National Highway of Pakistan
    A National Highway of Pakistan is a major federally administered road that forms part of the country’s primary intercity and interprovincial transport network, facilitating long-distance travel, trade, and connectivity between key urban and regional centers.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a922ad481908f4f1f884583cb42 completed April 21, 2026, 11:08 a.m.
Created at: April 21, 2026, 1:13 p.m.