Triple

T25258152
Position Surface form Disambiguated ID Type / Status
Subject Project Dantak E633227 entity
Predicate instanceOf P0 FINISHED
Object Border Roads Organisation project C49930 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Border Roads Organisation project
Context triple: [Project Dantak, instanceOf, Border Roads Organisation project]
  • A. National Highway of Pakistan
    A National Highway of Pakistan is a major federally administered road that forms part of the country’s primary intercity and interprovincial transport network, facilitating long-distance travel, trade, and connectivity between key urban and regional centers.
  • B. toll road project
    A toll road project is a transportation infrastructure initiative that plans, finances, constructs, and operates a roadway funded primarily through user fees collected from vehicles using the road.
  • C. National Highway in India
    A National Highway in India is a major public roadway designated and maintained by the central government to connect key cities, ports, and regions across the country for efficient long-distance transportation.
  • D. former national highway of India
    A former national highway of India is a roadway that was once part of the country's officially designated national highway network but has since been renumbered, reclassified, or decommissioned from that status.
  • E. road in Madhya Pradesh
    A road in Madhya Pradesh is a transportation route—ranging from national highways to rural village paths—that connects cities, towns, and villages across the central Indian state, supporting movement of people, goods, and services.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a922ad481908f4f1f884583cb42 completed April 21, 2026, 11:08 a.m.
Created at: April 21, 2026, 1:13 p.m.