Triple

T25258150
Position Surface form Disambiguated ID Type / Status
Subject Project Dantak E633227 entity
Predicate instanceOf P0 FINISHED
Object road construction project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road construction project
Context triple: [Project Dantak, instanceOf, road construction project]
  • A. toll road project
    A toll road project is a transportation infrastructure initiative that plans, finances, constructs, and operates a roadway funded primarily through user fees collected from vehicles using the road.
  • B. road infrastructure
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • C. road construction company
    A road construction company is an organization that plans, designs, builds, repairs, and maintains roads and related infrastructure for public and private clients.
  • D. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • E. road
    A road is a prepared surface or pathway designed for the movement of vehicles, pedestrians, or animals between different locations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a922ad481908f4f1f884583cb42 completed April 21, 2026, 11:08 a.m.
Created at: April 21, 2026, 1:13 p.m.