Triple

T25236440
Position Surface form Disambiguated ID Type / Status
Subject Pälli power plant E632350 entity
Predicate instanceOf P0 FINISHED
Object hydroelectric power station C359 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a8ec5f88190b9eba06ae42b413a completed April 21, 2026, 11:07 a.m.
Created at: April 21, 2026, 1:07 p.m.