Triple

T25224978
Position Surface form Disambiguated ID Type / Status
Subject Star Trek: Destiny trilogy E632066 entity
Predicate impactOnContinuity P103390 FINISHED
Object major turning point in Borg storyline in novels LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: major turning point in Borg storyline in novels | Statement: [Star Trek: Destiny trilogy, impactOnContinuity, major turning point in Borg storyline in novels]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: impactOnContinuity
Context triple: [Star Trek: Destiny trilogy, impactOnContinuity, major turning point in Borg storyline in novels]
  • A. disruptsContinuityOf
    Indicates that one entity interrupts, breaks, or otherwise prevents the ongoing, uninterrupted progression or sequence of another entity or process.
  • B. impactStatus
    Indicates the current state or condition of how something has affected or influenced a target.
  • C. continuityInfluenceOn
    Indicates how one entity’s continuity, consistency, or ongoing state affects or shapes another entity.
  • D. impactDescription chosen
    Indicates a description of the effect, consequence, or influence that one entity, action, or event has on another.
  • E. impactIfCompleted
    Indicates the effect or consequence that will occur if the referenced task or action is fully completed.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a8e0f688190a7aebe9a4815e25b completed April 21, 2026, 11:07 a.m.
NER Named-entity recognition batch_69f5ffc74fa481909b4fe24a9337f9eb completed May 2, 2026, 1:44 p.m.
PD Predicate disambiguation batch_69f5f7f99dc08190afcfb3bc4dfbec1d completed May 2, 2026, 1:11 p.m.
Created at: April 21, 2026, 1:03 p.m.