Triple

T2520464
Position Surface form Disambiguated ID Type / Status
Subject MRT Line 7 E55509 entity
Predicate instanceOf P0 FINISHED
Object public transportation infrastructure project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public transportation infrastructure project
Context triple: [MRT Line 7, instanceOf, public transportation infrastructure project]
  • A. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • B. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • C. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • D. rail transit
    Rail transit is a public transportation system that moves passengers or freight along fixed steel tracks using trains, subways, trams, or light rail vehicles, typically in urban or intercity corridors.
  • E. combined civic building and transportation hub
    A combined civic building and transportation hub is a multifunctional public facility that integrates government or community services with major transit infrastructure to centralize access, improve connectivity, and enhance urban efficiency.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab49e4749c8190813311efd1630f1b completed March 6, 2026, 9:40 p.m.
Created at: March 6, 2026, 9:46 p.m.