Triple

T25174016
Position Surface form Disambiguated ID Type / Status
Subject General Appropriations Bill E630396 entity
Predicate preparationPrecededBy P25144 FINISHED
Object budget preparation phase LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: budget preparation phase | Statement: [General Appropriations Bill, preparationPrecededBy, budget preparation phase]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: preparationPrecededBy
Context triple: [General Appropriations Bill, preparationPrecededBy, budget preparation phase]
  • A. preparationBy
    Indicates that one entity is created, assembled, or made ready through the actions or processes performed by another entity.
  • B. preparedBefore
    Indicates that one entity was prepared or made ready at an earlier time than another entity.
  • C. preparedFor
    Indicates that one entity has been made ready, equipped, or arranged in anticipation of use by or in connection with another entity.
  • D. preparesFor
    Indicates that one entity is used, designed, or undertaken in order to get another entity ready for a future event, state, or activity.
  • E. wasPrecededBy chosen
    Indicates that one event, state, or entity occurred or existed earlier in time than another.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a87c9b88190ab60731902a99750 completed April 21, 2026, 11:07 a.m.
NER Named-entity recognition batch_69f46dbc6fec8190a2ceb4cd781e824d completed May 1, 2026, 9:09 a.m.
PD Predicate disambiguation batch_69f44d8043b081908bbffd7f044b4f26 completed May 1, 2026, 6:51 a.m.
Created at: April 21, 2026, 12:21 p.m.