Triple
T25172729
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Phare Tower (unbuilt) |
E630364
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | proposed building |
C31067
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: proposed building Context triple: [Phare Tower (unbuilt), instanceOf, proposed building]
-
A.
building
A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
-
B.
building section
A building section is a vertical cut-through representation of a structure that reveals its internal arrangement, construction elements, and spatial relationships from foundation to roof.
-
C.
unbuilt building
chosen
An unbuilt building is a fully conceived architectural design that exists only in plans, models, or visualizations and has not yet been constructed in physical form.
-
D.
proposed bridge
A proposed bridge is a planned but not yet constructed structure designed to span a physical obstacle, documented through preliminary designs, locations, and specifications for evaluation and approval.
-
E.
experimental building
An experimental building is a structure designed and constructed to test innovative architectural concepts, materials, technologies, or spatial configurations that challenge conventional building practices.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e75a87c9b88190ab60731902a99750 |
completed | April 21, 2026, 11:07 a.m. |
Created at: April 21, 2026, 12:21 p.m.