Triple

T2516423
Position Surface form Disambiguated ID Type / Status
Subject Mumbai Port Trust E55422 entity
Predicate instanceOf P0 FINISHED
Object major port C452 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: major port
Context triple: [Mumbai Port Trust, instanceOf, major port]
  • A. seaport chosen
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • B. Port city
    A port city is an urban center located on a coast, river, or lake that serves as a hub for maritime transport, trade, and related economic and cultural activities.
  • C. inland port
    An inland port is a logistics and transportation hub located away from coastal seaports, typically along rivers, canals, or rail corridors, that facilitates the transfer, storage, and distribution of goods between different modes of transport.
  • D. port authority
    A port authority is an organization responsible for managing, regulating, and developing a seaport or group of ports, including their infrastructure, operations, and related maritime activities.
  • E. fishing port
    A fishing port is a coastal harbor facility where fishing vessels dock to unload catches, refuel, maintain equipment, and support the commercial fishing industry through processing, storage, and distribution services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab49e4749c8190813311efd1630f1b completed March 6, 2026, 9:40 p.m.
Created at: March 6, 2026, 9:46 p.m.