Triple

T2512792
Position Surface form Disambiguated ID Type / Status
Subject Metra Electric District line E52738 entity
Predicate connectsWith P37 FINISHED
Object South Shore Line E56009 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: South Shore Line | Statement: [Metra Electric District line, connectsWith, South Shore Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: South Shore Line
Context triple: [Metra Electric District line, connectsWith, South Shore Line]
  • A. South Shore Line chosen
    The South Shore Line is an electric commuter rail service connecting Chicago with communities in northern Indiana, including Gary.
  • B. Metra Rock Island District line
    The Metra Rock Island District line is a commuter rail route in the Chicago metropolitan area that connects downtown Chicago with various southwest suburbs, including Tinley Park.
  • C. Brown Line
    The Brown Line is a rapid transit route of Chicago's "L" system that primarily serves the city's North Side and northwest neighborhoods.
  • D. Metra
    Metra is the commuter rail system serving the Chicago metropolitan area, operating extensive routes that connect the city with its surrounding suburbs.
  • E. Orange Line
    The Orange Line is a rapid transit route in Chicago that connects the city's Loop with Midway International Airport as part of the Chicago "L" system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4958e76481908a235377dd921c9e completed March 6, 2026, 9:38 p.m.
NER Named-entity recognition batch_69abd20b6d008190acec0eb172e218c9 completed March 7, 2026, 7:21 a.m.
NED1 Entity disambiguation (via context triple) batch_69af2b934d3c81909627a5f4d6e6ca6a completed March 9, 2026, 8:20 p.m.
Created at: March 6, 2026, 9:46 p.m.