Triple

T2512099
Position Surface form Disambiguated ID Type / Status
Subject Río de los Remedios E52724 entity
Predicate instanceOf P0 FINISHED
Object transport infrastructure in Mexico City C4130 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transport infrastructure in Mexico City
Context triple: [Río de los Remedios, instanceOf, transport infrastructure in Mexico City]
  • A. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • B. transport infrastructure network chosen
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • C. Mexican Federal Highway
    A Mexican Federal Highway is a nationally administered roadway forming part of Mexico’s primary highway network, designed to connect major cities, regions, and borders for long-distance vehicular travel.
  • D. transportation corridors collection
    A transportation corridors collection is an organized set of linear pathways—such as roads, railways, and transit routes—grouped for managing, analyzing, or planning movement across a region.
  • E. combined civic building and transportation hub
    A combined civic building and transportation hub is a multifunctional public facility that integrates government or community services with major transit infrastructure to centralize access, improve connectivity, and enhance urban efficiency.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4958e76481908a235377dd921c9e completed March 6, 2026, 9:38 p.m.
Created at: March 6, 2026, 9:46 p.m.