Triple
T2512099
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Río de los Remedios |
E52724
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transport infrastructure in Mexico City |
C4130
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transport infrastructure in Mexico City Context triple: [Río de los Remedios, instanceOf, transport infrastructure in Mexico City]
-
A.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
B.
transport infrastructure network
chosen
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
C.
Mexican Federal Highway
A Mexican Federal Highway is a nationally administered roadway forming part of Mexico’s primary highway network, designed to connect major cities, regions, and borders for long-distance vehicular travel.
-
D.
transportation corridors collection
A transportation corridors collection is an organized set of linear pathways—such as roads, railways, and transit routes—grouped for managing, analyzing, or planning movement across a region.
-
E.
combined civic building and transportation hub
A combined civic building and transportation hub is a multifunctional public facility that integrates government or community services with major transit infrastructure to centralize access, improve connectivity, and enhance urban efficiency.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4958e76481908a235377dd921c9e |
completed | March 6, 2026, 9:38 p.m. |
Created at: March 6, 2026, 9:46 p.m.