Triple

T25117072
Position Surface form Disambiguated ID Type / Status
Subject Inga Falls E629156 entity
Predicate infrastructureUse P138399 FINISHED
Object hydroelectric power generation LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: hydroelectric power generation | Statement: [Inga Falls, infrastructureUse, hydroelectric power generation]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: infrastructureUse
Context triple: [Inga Falls, infrastructureUse, hydroelectric power generation]
  • A. usesInfrastructure
    Indicates that one entity makes use of, depends on, or operates through the infrastructure provided or managed by another entity.
  • B. infrastructureFocusArea
    Indicates the specific aspect or domain of infrastructure that an entity, project, or activity is primarily concerned with or directed toward.
  • C. usedTransportationInfrastructure
    Indicates that an entity made use of some form of transportation infrastructure (such as roads, railways, or ports) to enable movement or transit.
  • D. infrastructureAssociatedWith chosen
    Indicates a relationship where a piece of infrastructure is functionally or contextually connected to, supports, or is used by another entity.
  • E. infrastructureNeed
    Indicates that an entity requires the development, improvement, or provision of infrastructure to meet its functional or operational needs.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2ff3169d08190973b6061d5009abd completed April 18, 2026, 3:49 a.m.
NER Named-entity recognition batch_69f465c7b88c81909fefbf647d1b810d completed May 1, 2026, 8:35 a.m.
PD Predicate disambiguation batch_69f442c861188190967655c6d8012380 completed May 1, 2026, 6:06 a.m.
Created at: April 18, 2026, 6:27 a.m.