Triple
T25117072
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Inga Falls |
E629156
|
entity |
| Predicate | infrastructureUse |
P138399
|
FINISHED |
| Object | hydroelectric power generation |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: hydroelectric power generation | Statement: [Inga Falls, infrastructureUse, hydroelectric power generation]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: infrastructureUse Context triple: [Inga Falls, infrastructureUse, hydroelectric power generation]
-
A.
usesInfrastructure
Indicates that one entity makes use of, depends on, or operates through the infrastructure provided or managed by another entity.
-
B.
infrastructureFocusArea
Indicates the specific aspect or domain of infrastructure that an entity, project, or activity is primarily concerned with or directed toward.
-
C.
usedTransportationInfrastructure
Indicates that an entity made use of some form of transportation infrastructure (such as roads, railways, or ports) to enable movement or transit.
-
D.
infrastructureAssociatedWith
chosen
Indicates a relationship where a piece of infrastructure is functionally or contextually connected to, supports, or is used by another entity.
-
E.
infrastructureNeed
Indicates that an entity requires the development, improvement, or provision of infrastructure to meet its functional or operational needs.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2ff3169d08190973b6061d5009abd |
completed | April 18, 2026, 3:49 a.m. |
| NER | Named-entity recognition | batch_69f465c7b88c81909fefbf647d1b810d |
completed | May 1, 2026, 8:35 a.m. |
| PD | Predicate disambiguation | batch_69f442c861188190967655c6d8012380 |
completed | May 1, 2026, 6:06 a.m. |
Created at: April 18, 2026, 6:27 a.m.