Triple

T2510279
Position Surface form Disambiguated ID Type / Status
Subject Final Cut Pro E52683 entity
Predicate instanceOf P0 FINISHED
Object non-linear editing system C9707 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: non-linear editing system
Context triple: [Final Cut Pro, instanceOf, non-linear editing system]
  • A. film editor
    A film editor is a professional who selects, arranges, and refines recorded footage, sound, and visual elements to craft a coherent and engaging final motion picture.
  • B. media system
    A media system is an integrated framework of technologies, institutions, content, and audiences that produces, distributes, and regulates information and entertainment within a society.
  • C. television post-production company
    A television post-production company is a specialized business that handles the editing, visual effects, sound design, color correction, and final assembly of television content after filming is completed.
  • D. film post-production company
    A film post-production company is a business that specializes in editing, visual effects, sound design, color grading, and final mastering to complete and polish film and video projects after principal photography.
  • E. multimedia framework chosen
    A multimedia framework is a software infrastructure that provides tools, libraries, and services for processing, managing, and synchronizing various media types such as audio, video, images, and interactive content.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4958e76481908a235377dd921c9e completed March 6, 2026, 9:38 p.m.
Created at: March 6, 2026, 9:46 p.m.