Triple

T2508575
Position Surface form Disambiguated ID Type / Status
Subject Greater Manchester Transport Strategy E52645 entity
Predicate instanceOf P0 FINISHED
Object regional transport plan C10251 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: regional transport plan
Context triple: [Greater Manchester Transport Strategy, instanceOf, regional transport plan]
  • A. regional planning agency
    A regional planning agency is an organization responsible for coordinating land use, transportation, infrastructure, and environmental planning across multiple jurisdictions within a defined geographic region.
  • B. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • C. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • D. rail transit
    Rail transit is a public transportation system that moves passengers or freight along fixed steel tracks using trains, subways, trams, or light rail vehicles, typically in urban or intercity corridors.
  • E. planned regional parliament
    A planned regional parliament is a proposed legislative body intended to represent and govern a specific geographic region, but which has not yet been formally established or begun operation.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4958e76481908a235377dd921c9e completed March 6, 2026, 9:38 p.m.
Created at: March 6, 2026, 9:46 p.m.