Triple

T25064486
Position Surface form Disambiguated ID Type / Status
Subject BaltimoreLink E627744 entity
Predicate planningIncluded P21551 FINISHED
Object new transfer hubs LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: new transfer hubs | Statement: [BaltimoreLink, planningIncluded, new transfer hubs]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: planningIncluded
Context triple: [BaltimoreLink, planningIncluded, new transfer hubs]
  • A. plannedWith
    Indicates that an entity created or arranged a plan in collaboration or coordination with another entity.
  • B. planningProcessIncludes chosen
    Indicates that a broader planning process encompasses or contains a specific sub-process, step, or activity as one of its components.
  • C. plannedIn
    Indicates that an event, activity, or process is scheduled or arranged to occur within a specific context, timeframe, or plan.
  • D. planning
    Indicates that an entity is engaged in organizing or devising a future action, event, or course of behavior involving another entity or entities.
  • E. planningSupport
    Indicates that one entity provides assistance, resources, or guidance to another in the process of planning or preparing for something.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2ff2d71dc8190b4758e57d643cbe4 completed April 18, 2026, 3:49 a.m.
NER Named-entity recognition batch_69f497bc12b881908fe3386c66252bf6 completed May 1, 2026, 12:08 p.m.
PD Predicate disambiguation batch_69f49366e8d08190adb4b71fe3a14683 completed May 1, 2026, 11:49 a.m.
Created at: April 18, 2026, 6:10 a.m.